Environmental Management Checklist

Information

1. Has the machine been delivered to site free of debris and excess dirt?

2. Is the machine free of oil leaks?

3. Has machinery on-site been kept clear of all waterways & native vegetation areas?

4. Has storm-water runoff been diverted often enough to minimise any soil erosion?

5. Has silt fence been installed where required?

6. Has vegetation been left undisturbed where practical to minimise soil run off?

7. Have rock check dams been installed at regular intervals to prevent silt entering waterways & native vegetation areas?

Sign-Off

Please enter your email address above to receive a copy of the docket. (Optional)